Specify the planting arrangement (cross parent nursery)
- 1 Select the blocks' arrangement
- 1.1 Add Blocks
- 1.1.1 Assign entries
- 1.1.1.1 Add more entries to a block
- 1.1.1.2 Overwrite entries in a block
- 1.1.1.3 Specify no. of replicates
- 1.1.1.4 Reorder entries
- 1.1.1.5 Delete entries
- 1.1.2 Manage blocks
- 1.1.2.1 Remove a block
- 1.1.2.2 Remove plots
- 1.1.2.3 Reorder plots
- 1.1.3 Overview
- 1.1.1 Assign entries
- 1.1 Add Blocks
Can’t find what you’re
looking for? Search here!
After identifying your parents, you may now plan the arrangement of your entries. This involves adding blocks, assigning entries to them, and managing the blocks.
There are two options available when selecting the blocks' arrangement: Add blocks and Entry order.
Add blocks - allows you to add selected/all entries to each block.
Entry order - enables your planting arrangement in entry order regardless of the number of replicates specified for each entry.
After the intro… we can now focus on generating planting arrangement specific to CPN. CPN will require you to plant the entries in multiple batches with 1 week interval for each batch planting. This way, they will be able to synchronize the flowering time of parents for crossing. The arrangement per block is by entry order.
To do this:
Select the ‘Add Blocks’ option
Add blocks (no of blocks represent the no of times for staggered planting)
Assign entries (select all)
Add entries to block/s (check all BLOCKS). Specify details (dimension)
Manage blocks to see the assigned plots for entries in each block.
Overview
Then after describing planting arrangement for CPN
describe other features that user can do (e.g. overwrite entries,delete entries,reorder entries)
Select the blocks' arrangement
From the Add blocks subtab, you have the option to choose whether you’re going to add blocks first or arrange the order of your entries. To choose, toggle between Add Blocks and Entry Order.
Note that shifting to a different arrangement will nullify your updates.
Add Blocks
1. Specify the number of blocks you wish to add.
2. Click Add.
3. Under the No. of sub-blocks column, specify the number of sub-blocks in each block as necessary.
4. Once satisfied, click Save.
You’ll be notified that you have successfully added blocks and will be redirected to the Assign entries subtab.
Assign entries
The Assign Entries subtab is where you assign entries to your blocks. It has three sections: (A) Filter entries, (B) Entries, and (C) Working List.
1. From the Assign entries subtab, click on Filter entries to specify your filters for your entries you wish to assign to a block.
2. Click Submit.
3. The Entries section will show the entries based on your filters. Tick the of the entries you wish to add and assign to your blocks.
4. Click Add Entries.
5. The Working List section will reflect the entries you’ve added. Tick the of the entries you wish to assign to a block.
6. Click to add the entries to a block.
7. On the Assign entries to block modal window that appears, tick of the block/s where you wish to assign your selected entries.
Select at least one block.
8. Then specify details for your selected blocks. These include the no. of rows and columns in the block, starting corner, and plot numbering order.
All fields are required.
9. Click Save.
10. Click Assign More to assign more entries to other blocks. Otherwise, click Manage Blocks.
If you choose the latter, you’ll be directed to Manage Blocks subtab.
Add more entries to a block
You may still add entries to a block with existing entries.
1. Repeat steps 1-8 of assigning entries to a block.
2. Then on the Assign entries to blocks modal window, toggle to Append.
3. Click Save.
Overwrite entries in a block
You may still change the entries in a block that has entries already.
1. Repeat steps 1-8 of assigning entries to a block.
2. Then on the Assign entries to blocks modal window, toggle to Overwrite.
3. Click Save.
Specify no. of replicates
You may also specify the number of the entries' replicates as necessary.
Reorder entries
Drag and drop the entry’s to change their order in the block.
Delete entries
Tick the of the entries you wish to remove from your working list.
On the upper right of your working list, click.
Manage blocks
From the Manage Blocks subtab, you’ll be able to view your planting arrangement with the entry number and plot number reflected and to make changes in your planting arrangement. You may also view the list of plots assigned to each block, and remove and reorder the plots.
1. On the left side, click on the tab of the block whose information you wish to update.
2. Update the block’s information as necessary. You may change the no. of rows in block, the no. of columns in block, the starting corner, and the plot ordering number.
3. To check how your planting arrangement will appear, click Preview Layout.
3. A preview of your planting arrangement will reflect on the right side. Once satisfied, click Save.
Remove a block
1. On the left side, click on the tab of the block whose information you wish to delete.
2. Click Remove Block.
3. Once a confirmation appears, click Confirm to proceed with the deletion.
Remove plots
1. To remove plots, click Manage Plots.
2. Tick the of the plot/s you wish to remove.
3. On the upper-right corner of the list, click Remove Plot.
Reorder plots
Drag and drop the plots to change their order. You will be notified that you have successfully reordered the plots in the block.
Overview
Once done with managing your blocks, you can click the Overview subtab to check the number of entries assigned to your blocks and to view your blocks' information. All created blocks have to have an entry, and all entries must belong to a block.
Once satisfied, click Next.